Started in 1998, the world's leading integrated provider of waterproof services

Since 1998,Leading Integrated Waterproof Provider In The World!

scroll down

 

Foshan, Guangdong [Linyue Depot Project of Rail Transit Line 2]]
The Lin Yue Depot of Foshan Metro Line 2 adopts TOD (Traffic Leading Urban Development) mode for comprehensive development. The whole project is about 1300m long in the east-west direction and 320m wide in the north-south direction. The construction land area has reached more than 280000 square meters. It is the construction node with the largest area and investment scale in Foshan's rail transit projects under construction, and can be called the "Big Mac" of rail transit projects. The waterproof material of the project adopts Dayu Group TPZ series waterproof coiled material, which will be constructed in 2020 with a waterproof area of 300000 square meters.

搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • News
  • Introduction
  • Enterprise outlets
  • FAQ
  • Enterprise Video
  • Enterprise Atlas